This $54 Million Design/Build Project consists of widening US 601 from a two lane road to a four lane divided highway. The project is approximately 11 miles long and extends from just north of the South Carolina state line to just south of Monroe, NC. As a part of the Blythe Design/Build team, Sungate provided hydraulic design, sediment and erosion control design, and environmental permits.
R-2616 Project Website |
|
|
R-2510B Washington Bypass
|
As a part of the Flatiron-United Joint Venture Design Build team, Sungate completed drainage design and permitting for this $192 million project. This contract was the largest amount ever awarded by NCDOT. Sungate worked closely with NCDOT, NCDENR, and the Design Build Contractor to produce drainage design and environmental permits in an abbreviated time span to meet project deadlines. Sungate was also involved in value engineering of the design to help reduce the project cost. The highlight of this project consists of a 3 mile bridge that spans the Tar River and adjacent wetlands. The bridge will be constructed using two state of the art truss cranes that will utilize "top down" construction nearly eliminating the need to disturb the underlying wetlands.
|
|
U-3412 Martin Luther King Parkway
|
(U-3412A) Design-Build, Martin Luther King Parkway, Union County 2007
|
|
(I-4401) I-40, Buncombe County – 3.4 miles, Widening existing interstate. 2005
|
|
(R-2547) Design-Build, US 64 Knightdale Bypass, Wake County – 6 miles 2002
|
|
|
|
|
|
|
|